Network Rail will be carrying out major engineering work between Totnes and Plymouth from Saturday 21 February – Sunday 8 March 2026.
Timetable summary
Rail replacement road transport will operate between:
- Tiverton Parkway and Plymouth
- Totnes and Plymouth
Additionally, Saturday 28 February and Sunday 1 March 2026 engineering work will take place between Exeter St Davids and Plymouth.
Rail replacement road transport will operate between:
- Exeter St Davids, Newton Abbot, Totnes and Plymouth.
- Teignmouth and Newton Abbot.
Online journey planners are showing correctly.
Rail replacement road transport will depart from the following stations:
- Tiverton Parkway – Front of the station.
- Exeter St Davids - Front of the station.
- Newton Abbot - Front of the station.
- Totnes – Bus stop outside station building, platform 1 side.
- Plymouth - Front of the station.